CDCL was entrusted with survey, design and construction/rehabilitation of RCC bridges in the kingdom. As a part of the mandate CDCL carried out topography survey of Hejo and Dechenchholing proposed bridge site area and APECS was awarded this work.

Following were the major scope of the assignment:

  • Detailed topographic survey
  • Preparation of plan, longitudinal profile and cross-section
  • Bridge layout survey including fixing benchmarks.

Districts

Thimphu

Client

Thimphu Thromde

Timeline

November 2014- December 2014