Project Explorer

ADB Project No: 54142-002: Preparing Renewable Energy for Climate Resilience (conduct of studies to prepare three (3) Bhutan solar PV power plant sites)

ADB-BHU 50296-002: Skills Training and Education Pathways Up gradation (STEP UP), for Design of Expansion of the Technical Training Institute (TTI) Samthang, Wangdiphodrang.

Assessment of climate risks on agriculture for National Adaptation Plan (NAP) formulation process in Bhutan

Basic engineering training module development for local governance and decentralization project(LGDP) phase 3.

Development of Training Curriculum, Training Material and Conducting Training for Trainers on Farm Roads Construction and Monitoring.

Environment Impact Assessment (EIA) for the Development of Industrial town at Motonga under Samdrupjongkhar

Environment Impact Assessment (EIA) For The Construction Of 12km Cheng To Tobrang Farm Road Under Bumdeling Gewog, Trashiyangtse Dzongkhag

Consulting Services for conducting a Research on Transparency, Accountability and Corruption in Policy Making Process in Bhutan.

Development of Business Model for Operation & Management of CSI Market Outlet in Changzamtok, Thimphu.

Construction Supervision Consultancy Services for Farm Roads under Farm Road Rehabilitation Program funded through GoI-SDP ( Package 2: 5 dzongkhags covering 8 roads)

Detailed Topography Survey and design for 2.5 KM double lane and bridge survey of Nikachu Hydropower oroject, Trongsa.

Detailed Topography Survey for the re- construction of bridges at Hejo and Dechencholing, for the Thimphu Thromde.

Topography Survey of E4 Areas (Simtokha and Babesa) and Establishment of Control Points within Thimphu Thromde.

Survey and Design, environment and geotech studies and Construction supervision for the construction of new irrigration scheme under ABSD initiatives Sipsu to Biru (9km) under Samtse Dzongkhag

Survey and Design including environment and geotechnical studies and construction supervsion for the construction of new irrigration scheme under ABSD initiatives Moagoan (9km) under Sarpang Dzongkhag.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Jungley - Bongo Farm Road (12 km)under JFPR programme.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Phegpari - Thungkhar Farm Road(14Km) under JFPR programme.

Detailed survey & Design of Farm Road (LOT 2: 68km) covering 08 Dzongkhag under farm Road Rehabilitation Program funded by GOI.

Geotechnical studies and Laboratory Investigation of Detailed Project Report of Druk Bindu Small Hydropower Project

Preparation of Detailed project report for the revival of East-West Trail from Trashigang to Thimphu (Move for health trail)

Preparation of Detailed Project Report on Autoclaved Aerated Concrete Block Plant for Penden Cement Authority Limited (PCAL).

Detailed geotechnical investigation and engineering design for landslide mitigation under Phuentsholing Thromde and flood protection including hydrological modeling for Pasakha industrial area.

Design, Drawing and cost estimation including assessment of seismic damages for the redesign of Jamthog for RSTA terminal building at Phuentsholing.

Design and Drawing of G+2 Storied RCC frames vegetable market shed at Bajo Town, Wangdiphodrang Dzongkhag

Assessment of flooding hazards and Development of Climate-resilient flood mitigation measures at Shetikheri and Aiepoly (Big and Small)

Design and Drawing of G+2 Storied RCC frames vegetable market shed at Bajo Town, Wangdiphodrang Dzongkhag

Detailed geotechnical investigation and engineering design for landslide mitigation under Phuentsholing Thromde and flood protection including hydrological modeling for Pasakha industrial area.

Topography Survey of E4 Areas (Simtokha and Babesa) and Establishment of Control Points within Thimphu Thromde.

Assessment of flooding hazards and Development of Climate-resilient flood mitigation measures at Shetikheri and Aiepoly (Big and Small)

Detailed geotechnical investigation and engineering design for landslide mitigation under Phuentsholing Thromde and flood protection including hydrological modeling for Pasakha industrial area.

Preparation of Detailed Project Report on Autoclaved Aerated Concrete Block Plant for Penden Cement Authority Limited (PCAL).

Preparation of Detailed project report for the revival of East-West Trail from Trashigang to Thimphu (Move for health trail)

Detailed survey & Design of Farm Road (LOT 2: 68km) covering 08 Dzongkhag under farm Road Rehabilitation Program funded by GOI.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Phegpari - Thungkhar Farm Road(14Km) under JFPR programme.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Jungley - Bongo Farm Road (12 km)under JFPR programme.

Survey and Design including environment and geotechnical studies and construction supervsion for the construction of new irrigration scheme under ABSD initiatives Moagoan (9km) under Sarpang Dzongkhag.

Survey and Design, environment and geotech studies and Construction supervision for the construction of new irrigration scheme under ABSD initiatives Sipsu to Biru (9km) under Samtse Dzongkhag

Topography Survey of E4 Areas (Simtokha and Babesa) and Establishment of Control Points within Thimphu Thromde.

Construction Supervision Consultancy Services for Farm Roads under Farm Road Rehabilitation Program funded through GoI-SDP ( Package 2: 5 dzongkhags covering 8 roads)

Environment Impact Assessment (EIA) For The Construction Of 12km Cheng To Tobrang Farm Road Under Bumdeling Gewog, Trashiyangtse Dzongkhag

Environment Impact Assessment (EIA) for the Development of Industrial town at Motonga under Samdrupjongkhar

Assessment of flooding hazards and Development of Climate-resilient flood mitigation measures at Shetikheri and Aiepoly (Big and Small)

Detailed geotechnical investigation and engineering design for landslide mitigation under Phuentsholing Thromde and flood protection including hydrological modeling for Pasakha industrial area.

Assessment of flooding hazards and Development of Climate-resilient flood mitigation measures at Shetikheri and Aiepoly (Big and Small)

Design and Drawing of G+2 Storied RCC frames vegetable market shed at Bajo Town, Wangdiphodrang Dzongkhag

Design, Drawing and cost estimation including assessment of seismic damages for the redesign of Jamthog for RSTA terminal building at Phuentsholing.

Detailed geotechnical investigation and engineering design for landslide mitigation under Phuentsholing Thromde and flood protection including hydrological modeling for Pasakha industrial area.

Preparation of Detailed Project Report on Autoclaved Aerated Concrete Block Plant for Penden Cement Authority Limited (PCAL).

Preparation of Detailed project report for the revival of East-West Trail from Trashigang to Thimphu (Move for health trail)

Detailed survey & Design of Farm Road (LOT 2: 68km) covering 08 Dzongkhag under farm Road Rehabilitation Program funded by GOI.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Phegpari - Thungkhar Farm Road(14Km) under JFPR programme.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Jungley - Bongo Farm Road (12 km)under JFPR programme.

Survey and Design including environment and geotechnical studies and construction supervsion for the construction of new irrigration scheme under ABSD initiatives Moagoan (9km) under Sarpang Dzongkhag.

Survey and Design, environment and geotech studies and Construction supervision for the construction of new irrigration scheme under ABSD initiatives Sipsu to Biru (9km) under Samtse Dzongkhag

Detailed Topography Survey and design for 2.5 KM double lane and bridge survey of Nikachu Hydropower oroject, Trongsa.

Development of Training Curriculum, Training Material and Conducting Training for Trainers on Farm Roads Construction and Monitoring.

Basic engineering training module development for local governance and decentralization project(LGDP) phase 3.

Preparation of Detailed project report for the revival of East-West Trail from Trashigang to Thimphu (Move for health trail)

Detailed survey & Design of Farm Road (LOT 2: 68km) covering 08 Dzongkhag under farm Road Rehabilitation Program funded by GOI.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Phegpari - Thungkhar Farm Road(14Km) under JFPR programme.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Jungley - Bongo Farm Road (12 km)under JFPR programme.

Survey and Design including environment and geotechnical studies and construction supervsion for the construction of new irrigration scheme under ABSD initiatives Moagoan (9km) under Sarpang Dzongkhag.

Survey and Design, environment and geotech studies and Construction supervision for the construction of new irrigration scheme under ABSD initiatives Sipsu to Biru (9km) under Samtse Dzongkhag

Detailed Topography Survey for the re- construction of bridges at Hejo and Dechencholing, for the Thimphu Thromde.

Detailed Topography Survey and design for 2.5 KM double lane and bridge survey of Nikachu Hydropower oroject, Trongsa.

Construction Supervision Consultancy Services for Farm Roads under Farm Road Rehabilitation Program funded through GoI-SDP ( Package 2: 5 dzongkhags covering 8 roads)

Environment Impact Assessment (EIA) For The Construction Of 12km Cheng To Tobrang Farm Road Under Bumdeling Gewog, Trashiyangtse Dzongkhag

Detailed geotechnical investigation and engineering design for landslide mitigation under Phuentsholing Thromde and flood protection including hydrological modeling for Pasakha industrial area.

Environment Impact Assessment (EIA) for the Development of Industrial town at Motonga under Samdrupjongkhar

Assessment of climate risks on agriculture for National Adaptation Plan (NAP) formulation process in Bhutan

Assessment of flooding hazards and Development of Climate-resilient flood mitigation measures at Shetikheri and Aiepoly (Big and Small)

Design and Drawing of G+2 Storied RCC frames vegetable market shed at Bajo Town, Wangdiphodrang Dzongkhag

Detailed geotechnical investigation and engineering design for landslide mitigation under Phuentsholing Thromde and flood protection including hydrological modeling for Pasakha industrial area.

Preparation of Detailed project report for the revival of East-West Trail from Trashigang to Thimphu (Move for health trail)

Geotechnical studies and Laboratory Investigation of Detailed Project Report of Druk Bindu Small Hydropower Project

Detailed survey & Design of Farm Road (LOT 2: 68km) covering 08 Dzongkhag under farm Road Rehabilitation Program funded by GOI.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Phegpari - Thungkhar Farm Road(14Km) under JFPR programme.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Jungley - Bongo Farm Road (12 km)under JFPR programme.

Survey and Design including environment and geotechnical studies and construction supervsion for the construction of new irrigration scheme under ABSD initiatives Moagoan (9km) under Sarpang Dzongkhag.

Survey and Design, environment and geotech studies and Construction supervision for the construction of new irrigration scheme under ABSD initiatives Sipsu to Biru (9km) under Samtse Dzongkhag

Topography Survey of E4 Areas (Simtokha and Babesa) and Establishment of Control Points within Thimphu Thromde.

Detailed Topography Survey for the re- construction of bridges at Hejo and Dechencholing, for the Thimphu Thromde.

Detailed Topography Survey and design for 2.5 KM double lane and bridge survey of Nikachu Hydropower oroject, Trongsa.

Assessment of flooding hazards and Development of Climate-resilient flood mitigation measures at Shetikheri and Aiepoly (Big and Small)

Preparation of Detailed project report for the revival of East-West Trail from Trashigang to Thimphu (Move for health trail)

Detailed survey & Design of Farm Road (LOT 2: 68km) covering 08 Dzongkhag under farm Road Rehabilitation Program funded by GOI.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Phegpari - Thungkhar Farm Road(14Km) under JFPR programme.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Jungley - Bongo Farm Road (12 km)under JFPR programme.

Survey and Design including environment and geotechnical studies and construction supervsion for the construction of new irrigration scheme under ABSD initiatives Moagoan (9km) under Sarpang Dzongkhag.

Survey and Design, environment and geotech studies and Construction supervision for the construction of new irrigration scheme under ABSD initiatives Sipsu to Biru (9km) under Samtse Dzongkhag

Construction Supervision Consultancy Services for Farm Roads under Farm Road Rehabilitation Program funded through GoI-SDP ( Package 2: 5 dzongkhags covering 8 roads)

Environment Impact Assessment (EIA) For The Construction Of 12km Cheng To Tobrang Farm Road Under Bumdeling Gewog, Trashiyangtse Dzongkhag

Environment Impact Assessment (EIA) for the Development of Industrial town at Motonga under Samdrupjongkhar

Survey and Design including environment and geotechnical studies and construction supervsion for the construction of new irrigration scheme under ABSD initiatives Moagoan (9km) under Sarpang Dzongkhag.

Survey and Design, environment and geotech studies and Construction supervision for the construction of new irrigration scheme under ABSD initiatives Sipsu to Biru (9km) under Samtse Dzongkhag

Assessment of flooding hazards and Development of Climate-resilient flood mitigation measures at Shetikheri and Aiepoly (Big and Small)

Preparation of Detailed Project Report on Autoclaved Aerated Concrete Block Plant for Penden Cement Authority Limited (PCAL).

Preparation of Detailed project report for the revival of East-West Trail from Trashigang to Thimphu (Move for health trail)

Detailed survey & Design of Farm Road (LOT 2: 68km) covering 08 Dzongkhag under farm Road Rehabilitation Program funded by GOI.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Phegpari - Thungkhar Farm Road(14Km) under JFPR programme.

Survey and Design including EIA, Socio-economic and Geotechnical study of ADB funded, Jungley - Bongo Farm Road (12 km)under JFPR programme.

Survey and Design including environment and geotechnical studies and construction supervsion for the construction of new irrigration scheme under ABSD initiatives Moagoan (9km) under Sarpang Dzongkhag.

Survey and Design, environment and geotech studies and Construction supervision for the construction of new irrigration scheme under ABSD initiatives Sipsu to Biru (9km) under Samtse Dzongkhag

Development of Business Model for Operation & Management of CSI Market Outlet in Changzamtok, Thimphu.

Consulting Services for conducting a Research on Transparency, Accountability and Corruption in Policy Making Process in Bhutan.

Environment Impact Assessment (EIA) For The Construction Of 12km Cheng To Tobrang Farm Road Under Bumdeling Gewog, Trashiyangtse Dzongkhag

Environment Impact Assessment (EIA) for the Development of Industrial town at Motonga under Samdrupjongkhar

Assessment of flooding hazards and Development of Climate-resilient flood mitigation measures at Shetikheri and Aiepoly (Big and Small)

Development of Business Model for Operation & Management of CSI Market Outlet in Changzamtok, Thimphu.

Consulting Services for conducting a Research on Transparency, Accountability and Corruption in Policy Making Process in Bhutan.

Development of Training Curriculum, Training Material and Conducting Training for Trainers on Farm Roads Construction and Monitoring.

Basic engineering training module development for local governance and decentralization project(LGDP) phase 3.

Preparation of Detailed Project Report on Autoclaved Aerated Concrete Block Plant for Penden Cement Authority Limited (PCAL).