DGPC carry feasibility study of small hydropower project engaging the services of individual professional and the national consulting firm. As part of Detailed Project Report, the DGPC carried out Survey and Mapping of Kuri I Hydropower Project where the services of APECS was engaged for carrying out detail survey and mapping works.

Following were the major scope of the assignment:

  • Fixing HRT Alignment on ground,
  • Layout of Adits
  • To pick up geological mapping points, outcrops of various structures on 1:1000/500 scales;
  • Connecting all drill holes points with established ground control stations using total stations; and
  • Surveying for drifting works at Dam and power house.

Districts

Mongar

Client

Druk Green Power Corporation Ltd

Timeline

December 2014 - May 2015