Carrying Out Survey And Mapping Of Kuri I Hydropower Project

DGPC carry feasibility study of small hydropower project engaging the services of individual professional and the national consulting firm. As part of Detailed Project Report, the DGPC carried out Survey and Mapping of Kuri I Hydropower Project where the services of APECS was engaged for carrying out detail survey and mapping works.

Following were the major scope of the assignment:

  • Fixing HRT Alignment on ground,
  • Layout of Adits
  • To pick up geological mapping points, outcrops of various structures on 1:1000/500 scales;
  • Connecting all drill holes points with established ground control stations using total stations; and
  • Surveying for drifting works at Dam and power house.

Detailed Topography Survey and design for 2.5 KM double lane and bridge survey of Nikachu Hydropower oroject, Trongsa.

Detailed Topography Survey and design for 2.5 KM double lane road and bridge survey of Nikachhu Hydropower project, Trongsa, was carried by CDCL for the construction of Nikachhu Hydropower project by engaging the services of APECS consultant.

Following were the major scope of the assignment:


• Detailed topographic survey and design
• To prepare of plan, longitudinal profile and cross-section as per the standard
• Computation of the earth works
• Fixing of centreline pillars at 20m interval.
• Set out survey at 20m interval
• Bridge layout survey including fixing benchmarks.

1 15 16 17 18 19 23